A domestic manufacturing milestone, tracked alongside our tender coverage.
Waaree Energy Storage battery pack line
Capacity
5.15 GWh/yr
Product
Battery packs
Location
Gujarat
Commercial production has started — another 5 GWh-class Indian pack line is now supplying the storage market.
Mercom India ↗What it means
Pack assembly is where imported or domestic cells become the modules and racks that go into BESS containers. A 5.15 GWh line on its own covers only a slice of the 40 GWh-plus now out to tender, which is why localisation is happening across many players at once. Waaree has also been winning storage projects, such as the 200 MW / 500 MWh BESS EPC on our tracker. Cell-level localisation is covered in our ACC battery PLI explainer.
Sourcing domestically assembled BESS for a project? Talk to our team.