A state DISCOM call that our news feeds missed in October. We added it to the tender tracker after our weekly check for large tenders.
APPCC standalone BESS for AP DISCOMs
Power
1,250 MW
Energy
5,000 MWh
Duration
4 hr
Discharge signature — long-duration, runs 4h of 8h at rated power
Three separately awarded four-hour projects for AP's DISCOMs, with a 25% green shoe and no VGF.
TaiyangNews ↗Tender at a glance
All points below are as reported by TaiyangNews.
| Project | Site | Capacity | Green shoe (up to 25%) |
|---|---|---|---|
| 1 | Dr. M.V. Ramana Reddy Rayalaseema Thermal Power Plant (RTPP) | 500 MW / 2,000 MWh | 125 MW / 500 MWh |
| 2 | Talaricheruvu RE Project | 250 MW / 1,000 MWh | 50 MW / 200 MWh |
| 3 | NP Kunta RE Project | 500 MW / 2,000 MWh | 125 MW / 500 MWh |
- Issuer: APPCC as bid coordinator for APCPDCL, APEPDCL and APSPDCL. The tender was issued on 7 October 2026.
- Model: build-own-operate. Each project is tendered, evaluated and awarded separately, with its own tariff.
- Operation: charge and discharge in blocks of 50 MW / 200 MWh or 100 MW / 400 MWh, alone or combined, at a 0.25C rate.
- Contract: a 12-year Battery Energy Storage Purchase Agreement (BESPA) with each DISCOM.
- VGF: none is available for these projects.
- Deadline: bids are accepted until 23 November 2026. EMD and eligibility terms were not in the report, so check the tender document on the APEPDCL e-procurement site.
What it means
Without VGF, bidders must recover the full capex from a 12-year capacity tariff. That is a tougher test of battery costs than the VGF-backed tenders, as our VGF scheme explainer shows. Siting two projects at renewable parks and one at a thermal plant reuses existing grid connections. For the state context, see our Andhra Pradesh BESS policy guide, and for how DISCOMs use these assets, our DISCOM peak-shaving tenders guide.